Home / Accounts Payables / Oracle Application Implementation Methodology (AIM) Document List

Oracle Application Implementation Methodology (AIM) Document List

Oracle Application Implementation Methodology (AIM) Document List

 

1.Business Process Architecture (BP)

  • BP.010 Define Business and Process Strategy 
  • BP.020 Catalog and Analyze Potential Changes 
  • BP.030 Determine Data Gathering Requirements 
  • BP.040 Develop Current Process Model 
  • BP.050 Review Leading Practices 
  • BP.060 Develop High-Level Process Vision 
  • BP.070 Develop High-Level Process Design 
  • BP.080 Develop Future Process Model 
  • BP.090 Document Business Procedure 

 

2. Business Requirements Definition (RD)

  • RD.010 Identify Current Financial and Operating Structure 
  • RD.020 Conduct Current Business Baseline 
  • RD.030 Establish Process and Mapping Summary 
  • RD.040 Gather Business Volumes and Metrics 
  • RD.050 Gather Business Requirements 
  • RD.060 Determine Audit and Control Requirements 
  • RD.070 Identify Business Availability Requirements 
  • RD.080 Identify Reporting and Information Access Requirements 

 

3. Business Requirements Mapping

  • BR.010 Analyze High-Level Gaps 
  • BR.020 Prepare mapping environment 
  • BR.030 Map Business requirements 
  • BR.040 Map Business Data 
  • BR.050 Conduct Integration Fit Analysis 
  • BR.060 Create Information Model 
  • BR.070 Create Reporting Fit Analysis 
  • BR.080 Test Business Solutions 
  • BR.090 Confirm Integrated Business Solutions 
  • BR.100 Define Applications Setup 
  • BR.110 Define security Profiles 

 

4. Application and Technical Architecture (TA)

  • TA.010 Define Architecture Requirements and Strategy 
  • TA.020 Identify Current Technical Architecture 
  • TA.030 Develop Preliminary Conceptual Architecture 
  • TA.040 Define Application Architecture 
  • TA.050 Define System Availability Strategy 
  • TA.060 Define Reporting and Information Access Strategy 
  • TA.070 Revise Conceptual Architecture 
  • TA.080 Define Application Security Architecture 
  • TA.090 Define Application and Database Server Architecture 
  • TA.100 Define and Propose Architecture Subsystems 
  • TA.110 Define System Capacity Plan 
  • TA.120 Define Platform and Network Architecture 
  • TA.130 Define Application Deployment Plan 
  • TA.140 Assess Performance Risks 
  • TA.150 Define System Management Procedures 

 

5. Module Design and Build (MD)

  • MD.010 Define Application Extension Strategy 
  • MD.020 Define and estimate application extensions 
  • MD.030 Define design standards 
  • MD.040 Define Build Standards
  • MD.050 Create Application extensions functional design 
  • MD.060 Design Database extensions 
  • MD.070 Create Application extensions technical design 
  • MD.080 Review functional and Technical designs 
  • MD.090 Prepare Development environment 
  • MD.100 Create Database extensions 
  • MD.110 Create Application extension modules 
  • MD.120 Create Installation routines 

 

6. Data Conversion (CV)

  • CV.010 Define data conversion requirements and strategy 
  • CV.020 Define Conversion standards 
  • CV.030 Prepare conversion environment 
  • CV.040 Perform conversion data mapping 
  • CV.050 Define manual conversion procedures 
  • CV.060 Design conversion programs 
  • CV.070 Prepare conversion test plans 
  • CV.080 Develop conversion programs 
  • CV.090 Perform conversion unit tests 
  • CV.100 Perform conversion business objects 
  • CV.110 Perform conversion validation tests 
  • CV.120 Install conversion programs 
  • CV.130 Convert and verify data 

 

7. Documentation (DO)

  • DO.010 Define documentation requirements and strategy 
  • DO.020 Define Documentation standards and procedures 
  • DO.030 Prepare glossary 
  • DO.040 Prepare documentation environment 
  • DO.050 Produce documentation prototypes and templates 
  • DO.060 Publish user reference manual 
  • DO.070 Publish user guide 
  • DO.080 Publish technical reference manual 
  • DO.090 Publish system management guide 

 

8. Business System Testing (TE)

  • TE.010 Define testing requirements and strategy 
  • TE.020 Develop unit test script 
  • TE.030 Develop link test script 
  • TE.040 Develop system test script 
  • TE.050 Develop systems integration test script 
  • TE.060 Prepare testing environments 
  • TE.070 Perform unit test 
  • TE.080 Perform link test 
  • TE.090 perform installation test 
  • TE.100 Prepare key users for testing 
  • TE.110 Perform system test 
  • TE.120 Perform systems integration test 
  • TE.130 Perform Acceptance test 

 

9. PERFORMANCE TESTING (PT)

  • PT.010 – Define Performance Testing Strategy 
  • PT.020 – Identify Performance Test Scenarios 
  • PT.030 – Identify Performance Test Transaction 
  • PT.040 – Create Performance Test Scripts 
  • PT.050 – Design Performance Test Transaction Programs 
  • PT.060 – Design Performance Test Data 
  • PT.070 – Design Test Database Load Programs 
  • PT.080 – Create Performance Test TransactionPrograms 
  • PT.090 – Create Test Database Load Programs 
  • PT.100 – Construct Performance Test Database 
  • PT.110 – Prepare Performance Test Environment 
  • PT.120 – Execute Performance Test 

 

10. Adoption and Learning (AP)

  • AP.010 – Define Executive Project Strategy 
  • AP.020 – Conduct Initial Project Team Orientation 
  • AP.030 – Develop Project Team Learning Plan 
  • AP.040 – Prepare Project Team Learning Environment 
  • AP.050 – Conduct Project Team Learning Events 
  • AP.060 – Develop Business Unit Managers’Readiness Plan 
  • AP.070 – Develop Project Readiness Roadmap 
  • AP.080 – Develop and Execute CommunicationCampaign 
  • AP.090 – Develop Managers’ Readiness Plan 
  • AP.100 – Identify Business Process Impact onOrganization 
  • AP.110 – Align Human Performance SupportSystems 
  • AP.120 – Align Information Technology Groups 
  • AP.130 – Conduct User Learning Needs Analysis 
  • AP.140 – Develop User Learning Plan 
  • AP.150 – Develop User Learningware 
  • AP.160 – Prepare User Learning Environment 
  • AP.170 – Conduct User Learning Events 
  • AP.180 – Conduct Effectiveness Assessment 

 

11. Production Migration (PM)

  • PM.010 – Define Transition Strategy 
  • PM.020 – Design Production Support Infrastructure 
  • PM.030 – Develop Transition and Contingency Plan 
  • PM.040 – Prepare Production Environment 
  • PM.050 – Set Up Applications 
  • PM.060 – Implement Production Support Infrastructure 
  • PM.070 – Verify Production Readiness 
  • PM.080 – Begin Production 
  • PM.090 – Measure System Performance 
  • PM.100 – Maintain System 
  • PM.110 – Refine Production System 
  • PM.120 – Decommission Former Systems 
  • PM.130 – Propose Future Business Direction 
  • PM.140 – Propose Future Technical Direction

 

 

 

About Syed Saad Ali

With 13 years of experience as a certified and skilled Oracle Database Administrator, I possess the expertise to handle various levels of database maintenance tasks and proficiently perform Oracle updates. Throughout my career, I have honed my analytical abilities, enabling me to swiftly diagnose and resolve issues as they arise. I excel in planning and executing special projects within time-sensitive environments, showcasing exceptional organizational and time management skills. My extensive knowledge encompasses directing, coordinating, and exercising authoritative control over all aspects of planning, organization, and successful project completions. Additionally, I have a strong aptitude for resolving customer relations matters by prioritizing understanding and effective communication. I am adept at interacting with customers, vendors, and management, ensuring seamless communication and fostering positive relationships.

Check Also

An Introduction to Financial Statement Generator (FSG)

An Introduction to Financial Statement Generator (FSG) Financial Statement Generator The Financial Statement Generator (FSG) …

Leave a Reply